Have an asphalt striping-related question? We have the answer. Check out these FAQs and call or text us today for more information!
Any parking lots with heavy traffic or harsh weather conditions should be repainted annually. Other types of lots can be repainted every two years.
Depending on the materials used and the weather conditions, the paint can dry in 20–60 minutes, but it can be drivable after approximately an hour. In hot weather, the paint may dry to the touch in less than 60 seconds.
You should make sure there are no cars obstructing the area before the striping crew arrives.
Consider these factors:
Existing striping can be ground away, painted over, and/or painted a different color.
Yes, at AA Striping, Inc, we also specialize in parking lot signage and can install, repair, straighten, and replace traffic signs.
Serving the Southern Colorado area, AA "Accurate & Affordable" Striping, Inc specializes in roadway striping, airfield striping, and parking lot striping. Next-day emergency services. Full-service striping specialists. In business since 2000. Call or text for a free estimate.
Share On: